Vintage 70’s Dimarzion Super Distortion Long Lead

  • Thread starter Thread starter scottosan
  • Start date Start date

To buy, sell, or trade in this section, you must have at least 50 posts and have two-factor authentication enabled.

scottosan

scottosan

Well-known member
70’s Dimarzio Super Distortion DP-100 2 conductor 13+” lead. Square Tab early version. All original, measures 13.94k on my multimeter @78 degrees

$125 shipped in US










 
Back
Top