scottosan Well-known member Oct 18, 2022 #1 70’s Dimarzio Super Distortion DP-100 2 conductor 13+” lead. Square Tab early version. All original, measures 13.94k on my multimeter @78 degrees $125 shipped in US
70’s Dimarzio Super Distortion DP-100 2 conductor 13+” lead. Square Tab early version. All original, measures 13.94k on my multimeter @78 degrees $125 shipped in US