N nickdaripper94 New member Mar 1, 2019 #1 Anyone know how long it usually takes to have Dave mod an amp? I recently acquired a 2014 BE100 in a trade and am considering having it modded to the 2016 specs.
Anyone know how long it usually takes to have Dave mod an amp? I recently acquired a 2014 BE100 in a trade and am considering having it modded to the 2016 specs.
R RACKSYSTEMS Well-known member Mar 2, 2019 #2 Depends on work load. 2 weeks to 4 weeks for a upgrade.. full mod on a MARSHALL can be way longer.