
Stumplegriltskin
Well-known member
I'm sure Floyd eye is gonna give me a verbal berating for not using beams under the joists, but the span is not that big and it's just for my wife, so she can sit in a pool. She always wanted a pool, but our yard is too sloped and I'm not staying in MA. I'm not looking forward to trying to figure out the sand pump. More joists to go in, and more supports, stairs leveled, but I wanted to get the frign lattice done first, as it has a frame and is a pain in the ass. It's not really up to code, but for a floating deck, it will be fine. I have cedar to go on top. Fucking rains every Saturday which is the only day I have to work on this. I hate carpentry. Too many fucking tools required to do this shit.