V
VonBonfire
Well-known member
That's cool but where does the 2" longer figure come from? I want to know how they arrived at that calculation.The bridge was basically pre-fabbed. They didn't just build it as they went. They knew exactly how long it would be before they started building it. The entire thing was built at a 40 acre factory built on the shore of the lake and the components were barged out into position.