J
jcj
Well-known member
shredhead666":2itdgmw7 said:I must be out of the loop. What's the history here? What happened with Cameron?
Got a spare four days?
shredhead666":2itdgmw7 said:I must be out of the loop. What's the history here? What happened with Cameron?
jcj":2lge8iqw said:shredhead666":2lge8iqw said:I must be out of the loop. What's the history here? What happened with Cameron?
Got a spare four days?
http://www.guitarampboard.com/forum/vie ... 787fbbf413shredhead666":2r5z2uq9 said:jcj":2r5z2uq9 said:shredhead666":2r5z2uq9 said:I must be out of the loop. What's the history here? What happened with Cameron?
Got a spare four days?
Explain it like I'm 5.
shredhead666":222h4ww3 said:jcj":222h4ww3 said:shredhead666":222h4ww3 said:I must be out of the loop. What's the history here? What happened with Cameron?
Got a spare four days?
Explain it like I'm 5.
charveldan":dw271smt said:http://www.guitarampboard.com/forum/vie ... 787fbbf413shredhead666":dw271smt said:jcj":dw271smt said:shredhead666":dw271smt said:I must be out of the loop. What's the history here? What happened with Cameron?
Got a spare four days?
Explain it like I'm 5.
The above is a waste of broadband IMO but you asked.![]()
one three channel mod here, at leastcarlygtr":19kwwnzn said:Has anybody ever tallied how many amps and/ or cash this Rat owes out?
shredhead666":1d0l0hed said:jcj":1d0l0hed said:shredhead666":1d0l0hed said:I must be out of the loop. What's the history here? What happened with Cameron?
Got a spare four days?
Explain it like I'm 5.
jcj":x8ql6uvl said:shredhead666":x8ql6uvl said:jcj":x8ql6uvl said:shredhead666":x8ql6uvl said:I must be out of the loop. What's the history here? What happened with Cameron?
Got a spare four days?
Explain it like I'm 5.
Mark takes deposits or payment in full for 14 CCV's and doesn't deliver.
Brad, Rob, and Dave, buy the rights to Cameron amps, and say they'll get the 14 missing amps out to those who paid.
Brad, Rob and Dave, take deposits on (and deliver) the first 25 amps.
Somewhere between A and B, Mark, Brad, Rob, and Dave, part ways.
Assembly of the second run is to be done by Metro, as the first run had some QC issues.
The Atomica and Old Bitch are released.
Two amps of the fourteen supposedly delivered, although no one will say to whom.
Brad, Rob and Dave, decide to redesign the CCV, take deposits for the next run, and can't quite make it happen.
People with deposits on the second run of CCV's were either refunded, or offered credit toward other product (as I understand).
Much, much, drama in between all points.
There ya have it....![]()
gibson5413":3mht2bls said:mentoneman":3mht2bls said:and if you had to pick a plan B which would you choose?
henning cherry bomb, friedman SS sig, suhr PT100, fortin cali.....
Loved my Fortin Cali mod. Great alternative. The Cherry Bomb is the only tube amp I am interested in. Steve makes a killer sounding amp.
shredhead666":27k7zcda said:jcj":27k7zcda said:shredhead666":27k7zcda said:jcj":27k7zcda said:shredhead666":27k7zcda said:I must be out of the loop. What's the history here? What happened with Cameron?
Got a spare four days?
Explain it like I'm 5.
Mark takes deposits or payment in full for 14 CCV's and doesn't deliver.
Brad, Rob, and Dave, buy the rights to Cameron amps, and say they'll get the 14 missing amps out to those who paid.
Brad, Rob and Dave, take deposits on (and deliver) the first 25 amps.
Somewhere between A and B, Mark, Brad, Rob, and Dave, part ways.
Assembly of the second run is to be done by Metro, as the first run had some QC issues.
The Atomica and Old Bitch are released.
Two amps of the fourteen supposedly delivered, although no one will say to whom.
Brad, Rob and Dave, decide to redesign the CCV, take deposits for the next run, and can't quite make it happen.
People with deposits on the second run of CCV's were either refunded, or offered credit toward other product (as I understand).
Much, much, drama in between all points.
There ya have it....![]()
Thanks! What was(were) the explanation(s) given for them not being able to either A) Deliver or B) issue refunds?
shredhead666":oh5tfiru said:jcj":oh5tfiru said:shredhead666":oh5tfiru said:jcj":oh5tfiru said:shredhead666":oh5tfiru said:I must be out of the loop. What's the history here? What happened with Cameron?
Got a spare four days?
Explain it like I'm 5.
Mark takes deposits or payment in full for 14 CCV's and doesn't deliver.
Brad, Rob, and Dave, buy the rights to Cameron amps, and say they'll get the 14 missing amps out to those who paid.
Brad, Rob and Dave, take deposits on (and deliver) the first 25 amps.
Somewhere between A and B, Mark, Brad, Rob, and Dave, part ways.
Assembly of the second run is to be done by Metro, as the first run had some QC issues.
The Atomica and Old Bitch are released.
Two amps of the fourteen supposedly delivered, although no one will say to whom.
Brad, Rob and Dave, decide to redesign the CCV, take deposits for the next run, and can't quite make it happen.
People with deposits on the second run of CCV's were either refunded, or offered credit toward other product (as I understand).
Much, much, drama in between all points.
There ya have it....![]()
Thanks! What was(were) the explanation(s) given for them not being able to either A) Deliver or B) issue refunds?
metalmaniac93":9oqr9gui said:shredhead666":9oqr9gui said:jcj":9oqr9gui said:shredhead666":9oqr9gui said:jcj":9oqr9gui said:shredhead666":9oqr9gui said:I must be out of the loop. What's the history here? What happened with Cameron?
Got a spare four days?
Explain it like I'm 5.
Mark takes deposits or payment in full for 14 CCV's and doesn't deliver.
Brad, Rob, and Dave, buy the rights to Cameron amps, and say they'll get the 14 missing amps out to those who paid.
Brad, Rob and Dave, take deposits on (and deliver) the first 25 amps.
Somewhere between A and B, Mark, Brad, Rob, and Dave, part ways.
Assembly of the second run is to be done by Metro, as the first run had some QC issues.
The Atomica and Old Bitch are released.
Two amps of the fourteen supposedly delivered, although no one will say to whom.
Brad, Rob and Dave, decide to redesign the CCV, take deposits for the next run, and can't quite make it happen.
People with deposits on the second run of CCV's were either refunded, or offered credit toward other product (as I understand).
Much, much, drama in between all points.
There ya have it....![]()
Thanks! What was(were) the explanation(s) given for them not being able to either A) Deliver or B) issue refunds?
No 2nd run CCV was built for one!! There were issues with getting refunds on partial and full deposits. Some had to go through their CC companies to get a refund.
It was making noise about a year ago if I recall correctlymetalmaniac93":3ngou1cx said:shredhead666":3ngou1cx said:jcj":3ngou1cx said:shredhead666":3ngou1cx said:jcj":3ngou1cx said:shredhead666":3ngou1cx said:I must be out of the loop. What's the history here? What happened with Cameron?
Got a spare four days?
Explain it like I'm 5.
Mark takes deposits or payment in full for 14 CCV's and doesn't deliver.
Brad, Rob, and Dave, buy the rights to Cameron amps, and say they'll get the 14 missing amps out to those who paid.
Brad, Rob and Dave, take deposits on (and deliver) the first 25 amps.
Somewhere between A and B, Mark, Brad, Rob, and Dave, part ways.
Assembly of the second run is to be done by Metro, as the first run had some QC issues.
The Atomica and Old Bitch are released.
Two amps of the fourteen supposedly delivered, although no one will say to whom.
Brad, Rob and Dave, decide to redesign the CCV, take deposits for the next run, and can't quite make it happen.
People with deposits on the second run of CCV's were either refunded, or offered credit toward other product (as I understand).
Much, much, drama in between all points.
There ya have it....![]()
Thanks! What was(were) the explanation(s) given for them not being able to either A) Deliver or B) issue refunds?
No 2nd run CCV was built for one!! There were issues with getting refunds on partial and full deposits. Some had to go through their CC companies to get a refund.