Well right out the gate, is the factory route going to accommodate the trem you decide to use? You probably wont find that out till you have the trem you want to use and fit it.
Another major consideration, are the bridge post going to align? Do you have the capability of securing dowels in the old bridge posts holes, drill and install new posts?